Demolition of redundant gas pipeline bridge and associated public realm and landscaping works.
MoreFell 5 individual trees and group of elm, undertake tree pruning operations as stated in schedule of tree works.
MoreProposed 16m Phase 8 street works pole to replace existing Phase 4 street works pole and associated ancillary works.
MoreErection and siting of fibre exchange telecommunications infrastructure to provide a full fibre (gigabit) to the premises service.
MoreErection of bike store.
MoreTo undertake Passenger Awareness Monitor works at Bath Spa Railway station.
MoreT01 – Sycamore – Cut back branches extending over property to south, cut back overhanging branches on eastern side of canopy back to site boundary. T02 – Sycamore – Cut back overhanging branches on eastern side of canopy back to site boundary. T03 – Hybrid Black Poplar – No works required. T04 – Hybrid Black…
MoreInstallation of a 20 metre high monopole supporting 6 no. antennas and 2 no. transmission dishes, 4 no. equipment cabinets and development works ancillary thereto.
MoreProposed 18.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.
MoreCrown lift trees in Brunel Square by up to 3m. Crown lift trees to rear of station by up to 3m.
MoreProposed 5G telecoms installation: H3G Phase 8 18m high street pole c/w wrap-around cabinet and 3 further additional equipment cabinets.
MoreErection of open sided storage shed.
MoreInstallation of 18m slim line phase 8 monopole c/w wraparound cabinet at base, 3no. additional ancillary equipment cabinets and associated ancillary works.
MoreProposed 5G telecoms installation of 20m high ‘slim line’ Phase 8 H3G street pole c/w wrap around cabinet and 3no. cabinets with ancillary works, to be coloured grey.
MoreDemolition of existing building; mixed-use redevelopment of site for storage and distribution (Class B8) and 120 units of purpose-built student accommodation (sui generis); and associated access and landscaping works (re-submission).
MoreExpansion of the existing car park. Widen entrance to car park to allow for two vehicles to pass side by side, additional street lighting, CCTV pole, fencing, cycle storage and installation of active and passive electrical vehicle charge points.
MoreErection of temporary contractor’s compound for site works at Cleveland Pools, Hampton Row, Bath. (Retrospective).
MoreInstallation of rooftop plant and equipment; erection of courtyard plant room; and all associated works to support the Hospital’s existing operating theatres and recovery room.
MoreInstallation of 1no. telecommunications three bay cabinet, 1no. footway chamber and associated underground telecommunications ducting and electricity ducting.
MoreInstallation of 1 telecommunications 3 bay cabinet and 1 footway chamber.
MoreErection of a 20m high monopole supporting 3no. antennas and 2no. 0.3mm dishes above the top of the pole, the installation of 1no. equipment cabinet on new base and the installation of ancillary equipment.
More